Consideration of vibration monitoring, and monitoring stations and
schedules established
During construction, detailed records should be kept of:
Charge weight
Location of blast point(s) and distance(s) from existing structures
Delays
Response as indicated by vibration monitoring (for safety, small charges
should be used initially to establish a site-specific relationship between
charge weight, distance, and response)
8-13