Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 1
>
> Area Planning,Site Planning, and Design
Area Planning,Site Planning, and Design
Chapter 1:Introduction - ufc_3_210_01a0011
Design Team
Figure 1-1. Planning Hierarchy
Chapter 2:The Area Development Plan
The Area Development Plan Process
Functional Relationships
Base Map and Data Collection - ufc_3_210_01a0017
Data Collection - ufc_3_210_01a0018
ADP Site Analysis
Environmental Conditions and Hazards
Environmental Conditions and Hazards -Cont.
Opportunities and Constraints
Alternative Plan Development
Alternative Plan Development -Cont. - ufc_3_210_01a0024
Alternative Plan Development -Cont. - ufc_3_210_01a0025
Alternative Plan Development -Cont. - ufc_3_210_01a0026
Alternative Plan Evaluation - ufc_3_210_01a0027
Alternative Plan Evaluation - ufc_3_210_01a0028
The Area Development Plan Sketches
Determine Funding Priority
Figure 2-1. The area development plan process
Figure 2-3. Functional relationships matrix
Figure 2-5. Area transportation
Figure 2-6. Area utility supply lines
Figure 2-8. Analysis of built environment
Figure 2-10. Opportunities and constraints
Figure 2-12. Alternative 2 sketch plan
Figure 2-14. Evaluation matrix
Figure 2-16. Location map
Figure 2-17. Final area development plan
Figure 2-18. Phasing plan
Chapter 3: The Site Plan
Base Map and Data Collection - ufc_3_210_01a0043
Data Collection - ufc_3_210_01a0044
Site Analysis - ufc_3_210_01a0045
On-site data
On-site data -Cont.
Limited or Confined Site
Alternative Plan Evaluation - ufc_3_210_01a0049
Implementation - ufc_3_210_01a0050
Figure 3-1. Analysis of natural environment
Figure 3-2. Site opportunities and constraints
Figure 3-4. Alternative 2
Figure 3-6. Site evaluation matrix
Figure 3-8. Final site plan
Chapter 4:Design Criteria
Orientation Factors
Vehicular Circulation
Parking - ufc_3_210_01a0059
Emergency Vehicle Access
Pedestrian Circulation - ufc_3_210_01a0061
Surface Water Management
Drainage Control
Detention Ponds, Retention Ponds, and Infiltration Basins
Utility Systems Design
Physical Security
Site Features
Figure 4-1. Dimensional factors
Figure 4-2. Solar orientation
Figure 4-4. Wind orientation
Figure 4-5. Visual factors
Figure 4-7. Parking
Figure 4-9. Pedestrian circulation
Figure 4-10. Sidewalk plans
Figure 4-12. Surface water management
Figure 4-13. Detention, retention, and infiltration principles
Figure 4-14. Erosion control