TM 5-803-1
able Areas map. This is accomplished by preparing one or
c. The existing spatial arrangement of major functional
areas at the installation will be analyzed. including major
more working diagrams of the most desirable future
spatial relationships for the installation. These diagrams
tenant activities. This analysis identifies opportunities
and constraints for future development resulting from:
expansion of some functions. or separation of incompatible
- Fragmented and scattered functions.
functions. Each land area shown on the diagrams should
- Difficulty in maintaining lines of communication,
- Incompatibility of adjacent land uses.
be of sufficient magnitude to accommodate all future
- Total land area limitations.
requirements for the function appropriate to that use.
- Lack of transition areas for sensitive uses.
These requirements are based on the ASIP or TDA
- Limited expansion of built-up areas.
strength and developed as part of the mission analysis.
- Inappropriate use of environmentally sensitive areas.
plus a 25 percent allowance.
- Inefficient movement of material and personnel.
b. Figure 3-2 shows the procedure for calculating
- Incomplete circulation facilities.
gross land area requirements for each land use type
This analysis leads to the definition of specific problems in
( barracks. administration. community facilities. etc.).
existing locations and in functional relationships which
This procedure allows a comparison of total needs with
should be addressed in the Concept Plan. These problems
current availability and use. which in turn allows an
should be documented in the Master Plan Report.
identification of additional land area needs to accommo-
date the requirements. All available areas of the installation
3-4.
Synthesis
should be used to provide maximum long-range development
a. The synthesis step involves integrating the ideal
capability. All of the development capability of the
functional relationships with existing spatial relationships.
installation cantonment area should be incorporated while
within the physical restrictions documented on the Build-
maintaining required training and maneuver areas.
3-3