Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 1
>
> Design Procedures - index
Design Procedures - index
Chapter 1: Introduction - ufc_1_300_09n0010
Chapter 2: Policy
Sustainable Design - ufc_1_300_09n0012
Security Engineering Facilities Planning Manual
Certification - ufc_1_300_09n0014
Chapter 3. Development of Design Build Request for Proposal (RFP)
Electronic Design Deliverables
Chapter 4. Drawings
Discipline Requirements - ufc_1_300_09n0018
Chapter 5. Specifications
Regional Guide Specifications
UFGS Selection Order of Precedence
Experience Clauses
Warranty Clauses
Specifying New Items
Coordination - ufc_1_300_09n0025
Project Information Form (PIF) - ufc_1_300_09n0026
Combining Projects into One Bid Package
Detailed Guidance
Detailed Guidance -Cont.
Chapter 6: Contract Line Items
Additive Items
Chapter 7. Electronic Design Deliverables (EDD)
Layer Guidelines
File Naming Convention for CADD Files
Facility Type and I.D. Designators
Drawing Support Files
Final Design or Final RFP Documents
Procedures for Multi-File Drawings
Procedures for Multi-File Specifications or RFP
Record Drawing Preparation
Source Documents
Record Drawing File Naming
Specific Software Requirements
Minimum Record Drawing Submittal Requirements
Chapter 8: Design Reviews
Reviews for Health Hazards During Facilities Design Process
Civil Works Contracts Reviews
Local Design Reviews
Final Government Approval
Chapter 9: Predesign Submittal Requirements
Environmental Requirements
Coordination - ufc_1_300_09n0055
Foundation and Soils Investigation
Geotechnical Report
Requirements and Management Plan (RAMP)
Chapter 10. Design Submittal Requirements
Basis of Design
Discipline Requirements - ufc_1_300_09n0061
Specifications - ufc_1_300_09n0062
Architectural - ufc_1_300_09n0063
Geotechnical
Design Development Submittals
Landscape Architecture
Mechanical - ufc_1_300_09n0067
Outline Specifications
Building Heating and Cooling Load
Design-Build - ufc_1_300_09n0070
Specifications or RFP Development
Project Information Form (PIF) - ufc_1_300_09n0072
Sustainable Design - ufc_1_300_09n0073
Color Documentation Binders
Chapter 11. Post Design or Post RFP Development Submittal Requirements
Language Format
Table 11-1 Specification or RFP Changes Format
Drawing Changes and Sketches
OMSI
Table 11-2. Drawing Changes Format
Figure 11-1. Sample Amendment
Figure 11-1. Sample Amendment -Cont.
Figure 11-2. Sample Contract Modification
Chapter 12. Post -Construction Documents
Glossary - ufc_1_300_09n0086
Glossary -Cont. - ufc_1_300_09n0087
Glossary -Cont. - ufc_1_300_09n0088
Appendix A: References - ufc_1_300_09n0089
Appendix A: References -Cont. - ufc_1_300_09n0090
Appendix A: References -Cont. - ufc_1_300_09n0091
Appendix A: References -Cont. - ufc_1_300_09n0092
Appendix A: References -Cont. - ufc_1_300_09n0093
Appendix B: Supplemental Resources