CEMP-E
AEI for Installation Support
Thursday, 17 October 1996
ARCHITECTURAL AND ENGINEERING INSTRUCTIONS
FOR
INSTALLATION SUPPORT
PART V - EXAMPLES, FORMS, AND SAMPLE DRAWINGS
1. Enclosure 1: Memorandum to Establish the NTCT/IS (USACE DCIS).
2. Enclosure 2: Examples of Simplified Design Methods (SDM), Examples A&B.*
3. Enclosure 3: Example of a Simplified Acquisition Procedure (SAP), Examples A&B.*
4. Enclosure 4: Example of a Requirements Contract (RC).*
5. Enclosure 5: Example of a Service Contract (SC).*
6. Enclosure 6: Example of a Total Housing Maintenance (THM) Contract.*
7. Enclosure 7: Example of a Job Order Contract (JOC).*
8. Enclosure 8: Examples of "Good News Stories" and Thoughts, Examples A&B.
*NOTE: These enclosures can be obtained from our USACE TECHINFO Home-Page
[http://w2.hnd.usace.army.mil/techinfo/aei/is_aei.asc] or our USACE Installation Support
Home-Page [http://www.hq.usace.army.mil/cemp/e/chmp_lst.htm].
V-1