Home
Download PDF
Order CD-ROM
Order in Print
Home
>
United Facilities Criteria CD 1
>
> Installation Support - index
Installation Support - index
General Instructions
Guidance for Customer Care
References - ufc_1_300_05a0015
Background - ufc_1_300_05a0016
Installation Support and Design Teams
Installation Support and Design Teams -Cont.
Design Team Members and Responsibilities
Typical Scope of Work (SOW) for Architect-Engineers (A-E) Contracts
Survey Information
Quality Assurance - ufc_1_300_05a0022
Drawing Production
Pre-Printed Drawing Sheet Sizes
Standard Details
Drawing Reproduction
Clarification of Photographs and Digitized Images
Design Criteria and Analysis
Standard Design Analysis Sheets
Specifications - ufc_1_300_05a0030
Special Contract Requirements
Required Adjustments
Point of Contact (POC)
Construction Phase (Post Award) Services
Operations and Maintenance Maintenance (O and M) Manuals
Types of Support
Simplified Design Methods (SDM)
Simplified Design Methods (SDM) -Cont. - ufc_1_300_05a0038
Simplified Design Methods (SDM) -Cont. - ufc_1_300_05a0039
Other Installation Support Efforts
Other Installation Support Efforts -Cont. - ufc_1_300_05a0041
Other Installation Support Efforts -Cont. - ufc_1_300_05a0042
Types of Contracts Available for Execution of Designs
Requirements Contracts (RC)
Service Contracts (SC)
Indefinite Delivery Contract (IDC)
Application
Description - ufc_1_300_05a0048
Time and Materials (T&M) Contracts
Summary of Differences and Advantages Between IDC, JOC, and T&M Contracts
Good News Stories and Thoughts
Examples, Forms, and Sample Drawings