        ![]() MIL-HDBK-1003/13A 
WORKSHEET A 
Job Summary 
Date 
Nov 1979 
Job Number 
Example 1 
Building 
Family Quarters 
General Construction 
Stucco 
Location 
Port Hueneme, California 
Occupancy 
Family of Four 
Hours of Occupancy 
Type of Solar System 
Space and DHW 
Building Area 
1,467 
sq ft 
No. BR 
3 
No. Baths 
2 
Fuel Gas  Burned in  Heater  @ 
70 
% assumed @ Cost $2.30 /106Btu 
efficiency   
@ 
% 
/106Btu 
@ 
% 
/106Btu 
Solar Collector Description: 
Single glazed glass, Copper absorber, 
Selective coating 
Approx. Cost, installed, total system 
$ 
/sq ft DHW 
(Worksheet F) 
$ 40.10 /sq ft Space Heating/DHW 
 (1)   
_   
(x)   
(y) 
 Area  
f    Solar  Value of 25 year   Savings/  Payback Period   
(From (From  System  
Fuel Saved 
 Investment (NAVFAC Manual   
 E-1)  E-1)   Cost   
(From E-1 - 
Ratio   
P-442) 
(From F) 
column (9) 
(y)/(x)  
Or E-2) 
  200  .646   8,020  
12,094 
1.51 
- 18 years 
  300  .794  12,030  
14,865 
1.24 
- 22 years 
133 
 | 
			![]()  | 
		|
![]()  | 
		||