WORKSHEET G 
ADDITIONAL COST ITEMS RELATED TO USE OF SOLAR HEATING 
JOB NO.________________________ 
 ATTRIBUTED TO PLANNED SOLAR SYSTEM  
COST ITEM 
(Capital costs this sheet) 
Yes 
No 
Cost 
Change or add unit heaters 
Change or add circulating pumps 
Change or add controls, e.g., 
to radiators, attic exhaust fan 
Increase in interior floor space to 
accommodate tempering or storage 
tanks, pumps, etc. 
Excavation and backfill, storage 
tank 
Elimination of excess standby 
boilers, furnaces, etc. 
Capital value of space obtained by 
eliminating boilers, etc. in above 
item. 
Electricity for pumps, fans - excess   
cost over conventional system 
Other 
Total 
Convert to $/sq ft collector: 
Ac 
= ___________sq ft 
Total = _____________$/sq ft, transfer to Worksheet F. 