        ![]() MIL-HDBK-1003/13A 
WORKSHEET F 
SOLAR SYSTEM COST ANALYSIS 
JOB NO._______________________ 
Area_______sq ft_____ sq ft 
Item Description 
Space Heating/DHW 
DHW Only 
(1) Collector 
/sq ft 
/sq ft 
(2) Storage tank, installed,______________ 
/sq ft 
/sq ft 
$______ /gal x______ gal/sq ft collector 
(3) Auxiliary heating unit, installed 
/sq ft 
/sq ft 
cost/sq ft collector, net of 
conventional unit cost 
(3) Pumps, pipe, heat exchangers, controls 
/sq ft 
/sq ft 
cost/sq ft collector 
Other (from Worksheet G) 
/sq ft 
/sq ft 
Subtotal 
(1) Collector installation 
/sq ft 
/sq ft 
(4) TOTAL 
(4)   Area 
Cost/sq ft 
  Cost 
(1) 
Manufacturer's data, or from Table 2-6 or Table 3-7, plus 80% - 100% for 
installation. 
(2) 
See Table 2-8 and Worksheet D-2, plus $.10 (antifreeze) and $1.50/sq ft 
(heat exchanger) if applicable. 
(3) 
See Table 3-6. 
(4) 
Transfer totals to Worksheet A. 