MIL-HDBK-1003/13A
WORKSHEET F
SOLAR SYSTEM COST ANALYSIS
JOB NO._______________________
Area_______sq ft_____ sq ft
Item Description
Space Heating/DHW
DHW Only
(1) Collector
/sq ft
/sq ft
(2) Storage tank, installed,______________
/sq ft
/sq ft
$______ /gal x______ gal/sq ft collector
(3) Auxiliary heating unit, installed
/sq ft
/sq ft
cost/sq ft collector, net of
conventional unit cost
(3) Pumps, pipe, heat exchangers, controls
/sq ft
/sq ft
cost/sq ft collector
Other (from Worksheet G)
/sq ft
/sq ft
Subtotal
(1) Collector installation
/sq ft
/sq ft
(4) TOTAL
(4) Area
Cost/sq ft
Cost
(1)
Manufacturer's data, or from Table 2-6 or Table 3-7, plus 80% - 100% for
installation.
(2)
See Table 2-8 and Worksheet D-2, plus $.10 (antifreeze) and $1.50/sq ft
(heat exchanger) if applicable.
(3)
See Table 3-6.
(4)
Transfer totals to Worksheet A.