Tweet |
Custom Search
|
|
|
||
MIL-HDBK-1003/13A
WORKSHEET A
Job Summary
Date______________________
Job Number____________________
Building________________________
General Construction__________________
Location________________________________________________________________
Occupancy___________________________ Hours of Occupancy_________________
Type of Solar System____________________________________________________
Building Area____________sq ft
No. BR____________
No. Baths_______
Fuel______Burned in__________@_________% assumed @ Cost_______/106Btu
efficiency
______
__________@_________%
_______/106Btu
______
__________@_________%
_______/106Btu
Solar Collector Description:____________________________________________
____________________________________________
Approx. Cost, installed, total system
$_______/sq ft DHW
(Worksheet F)
$_______/sq ft Space Heating/DHW
(1)
(x)
(y)
_
Area
f Solar Value of 25 year Savings/ Payback Period
(From (From System
Fuel Saved
Investment (NAVFAC Manual
E-1) E-1) Cost
(From E-1 -
Ratio
P-442)
(From F)
column (9)
(y)/(x)
Or E-2)
119
|
||