| Tweet | 
 
  
    Custom Search
   
 | 
      
         | 
 
       | 
		||
        ![]() MIL-HDBK-1003/13A 
WORKSHEET A 
Job Summary 
Date______________________ 
Job Number____________________ 
Building________________________ 
General Construction__________________ 
Location________________________________________________________________ 
Occupancy___________________________ Hours of Occupancy_________________ 
Type of Solar System____________________________________________________ 
Building Area____________sq ft 
No. BR____________ 
No. Baths_______ 
Fuel______Burned in__________@_________% assumed @ Cost_______/106Btu 
efficiency 
______ 
__________@_________% 
_______/106Btu 
______ 
__________@_________% 
_______/106Btu 
Solar Collector Description:____________________________________________ 
____________________________________________ 
Approx. Cost, installed, total system 
$_______/sq ft DHW 
(Worksheet F) 
$_______/sq ft Space Heating/DHW 
 (1)   
(x)   
(y) 
_   
 Area  
f    Solar  Value of 25 year   Savings/  Payback Period   
(From (From  System  
Fuel Saved 
 Investment (NAVFAC Manual   
 E-1)  E-1)   Cost   
(From E-1 - 
Ratio   
P-442) 
(From F) 
column (9) 
(y)/(x)  
Or E-2) 
119 
 | 
			![]()  | 
		|
![]()  | 
		||