Home > United Facilities Criteria CD 1 > > Figure 4-28a. Foundation Details and Maximum Thaw Penetration for Selected Years, Hangar at Thule, Greenland (Deep air duct foundation details
Figure 4-27b. Typical Pan Duct Foundation, Showing Section at Plenum Chamber and at Interior Column for Warehouse
Figure 4-28c. Foundation details and maximum thaw penetration for selected years, hangar at Thule, Greenland

Foundations For Structures: Artic and Subartic Construction - index
Page Navigation
  94    95    96    97    98  99  100    101    102    103    104  
TM 5-852-4/AFM 88-19, Chap. 4
U. S. Army Corps of Engineers
Figure 4-28a. Foundation Details and Maximum Thaw Penetration for Selected Years, Hangar at Thule, Greenland (Deep
air duct foundation details. Forced circulation by fans may be required where natural draft is not sufficient. Exhaust for
cooling duct is located on leeward side, 32 feet above grade. One plenum stack for each six or seven ducts. Arch tie rod
omitted for clarity.)
4-37






Western Governors University
< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.